Permit for the Direct Discharge of Stormwater into Water Bodies
This text comes from the German government’s official process catalogue (FIM). The rules of your state or city can differ. Always confirm with the responsible office.
In short
Do you want to allow stormwater to infiltrate the ground or discharge it into a surface water body? If so, you can apply for a water permit from the appropriate water authority.
What it is
If you wish to allow stormwater to infiltrate the ground or discharge it into a surface water body, you generally need a permit under water law.
Stormwater is the water collected from precipitation that runs off built-up or paved areas.
Surface water bodies include:
• rivers,
• lakes,
• canals,
• streams,
• ditches, and
• ponds.
You need a permit for infiltration if the infiltration could have a negative impact on groundwater quality.
You do not need a permit if no adverse changes to the groundwater are expected. In that case, you simply need to notify the responsible water authority of your project. Contact the water authority if you are unsure whether you need to apply for a permit.
The permit specifies the type and extent of use. It may be subject to conditions and ancillary provisions. Unlike an authorization, a permit can be revoked by the authorities.
Who can apply
• The harmful effects of stormwater are kept as low as is reasonably achievable given the current state of the art.
• The discharge is consistent with the requirements regarding water body characteristics and other legal requirements.
• If necessary, they shall construct and operate facilities or other installations to ensure compliance with these requirements.
Documents you need
• Motion
• Calculations Regarding Pollution and the Need for Treatment of Stormwater
•
in the case of infiltration:
• Hydrogeological report
• Description, layout, and design of the infiltration system
•
For discharge into surface waters:
• Evidence that infiltration is not possible
• Specifications, illustration, and mathematical verification of the required stormwater retention system
• Site Plan
• Site plan
• Excerpt from the cadastral map
• Schematic representation of the structure or facility
• Accompanying nature conservation planning; for new facilities, this includes entry in the compensation area registry
• Technical Report on the Water Framework Directive
How it works
You can apply to the appropriate agency for a permit to discharge stormwater directly. In general, the procedure is as follows:
• You submit your application along with the required documents to the relevant water authority.
• The authority will verify that your application is complete and will contact you if any information or documents are missing;
• reviews your application from the perspective of water management and water law, and involves other agencies if necessary.
•
You will receive
• a permit or
• a notice of denial.
• You will also receive a fee notice.
• You pay the fee.
Deadlines
There is no deadline. Apply for the permit well in advance of the start of your project.
How long it takes
Processing time varies depending on the completeness and scope of the application documents.
If you disagree
• Appeal
• Lawsuit before the Administrative Court