Guides · Official processes
Apply for the construction of a footpath crossing
This text comes from the German government’s official process catalogue (FIM). The rules of your state or city can differ. Always confirm with the responsible office.
In short
If you wish to have a footpath crossing (lowered kerb) built, you must apply for a permit.
What it is
A footpath crossing is also known as a lowered kerb. It is used for easy access to your own property from the street with a vehicle.
To do this, you need permission in advance from the local civil engineering office. The civil engineering office can provide you with specific regulations on how the footpath crossing must be constructed.
Who can apply
You are the landowner, tenant or other authorized person.
Documents you need
• Application, if available
• Any necessary attachments (e.g. cadastral plan, site plan)
How it works
• You apply to the responsible authority for the construction of the footpath crossing.
• The application will be reviewed.
• For more extensive measures, you must organize and carry out an on-site appointment in advance together with the responsible authority.
• Once your application has been approved, you will receive a notice of approval and can have the footpath crossing built (subject to possible conditions and requirements).
Fees
€22.00: The fee is charged by the Schleswig-Holstein Road Construction and Transport Authority if it is responsible.
Deadlines
You can start work as soon as you have received permission.
How long it takes
Individually according to expenditure.
Responsible office
• Regional civil engineering office
• For exceptions (e.g. cycle paths on federal highways) Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein
If you disagree
• Objection
• Complaint
Legal basis
§ 21 of the Road and Trail Act of the State of Schleswig-Holstein (StrWG)
§ 24 of the Road and Trail Act of the State of Schleswig-Holstein (StrWG)
Last updated: 2026-08-21